Second Floor Framing Complete!

The House on High Street

Our carpenter was able to get the 2nd floor framing completed before he went on a holiday vacation. This gives us some time to catch up on picking plumbing fixtures and other items needed prior to rough-in on 2nd floor.

Two Bedrooms now including a Jack & Jill Bath and Laundry Room in the middle. Three Door frames are put into place.
Jack & Jill Bathroom Entrance from the Rose Room.
This photo is taken from the Blue Room (Back Spare Bedroom). You can see the framing for the Laundry Room to the left and the Jack & Jill Bath on the Right.
This is taken inside the Jack & Jill Bathroom Vanity Area. The door to the right would open to a private bathtub and toilet area.
Master closet entry door framed.

We are using the flooring from the original bathroom as replacement boards since this will soon become an outside deck. The old stairs which once came up from the 1st floor kitchen were also removed during demo.

MORE DEMO

More demo on the house happened since we weren’t able to re-use the old chimneys (they used coal prior) and the openings where one would place a normal firebox for logs did not exisit. You can see how narrow the old brick was while the wall/storage built-in on either side made it appear larger.